K&A Scope of Work: Engineering, molds, fabrication, and installation for jellyfish tank
Project Description: This FRP tank was engineered by using finite element analysis to determine the different laminate designs which consisted of 1" to 2" balsa core with 1/4" to 1/2" FRP skins. Isophthalic polyester resin was used with e-glass reinforcement. The finish was a flat black polyester gelcoat.
Progress Photos:
Finite Element Analysis
![]() |
![]() |
![]() |
||
| Finite element model | Outer skin stress
under hydrostatic load |
Deflection under hydrostatic load |
||
Shop Drawings
![]() |
![]() |
![]() |
||
| Plan view | Front elevation | Side Elevation | ||
![]() |
![]() |
||
| Reflected plan | Left skimmer box | ||
Fabrication
![]() |
![]() |
![]() |
![]() |
||
| Mold making | Mold making | Ready for fiberglass | First half of tank | ||
![]() |
![]() |
![]() |
![]() |
||
| Laminating | Demolding | Skimmer box details | Loading into container | ||
Installation: Paradise Island, The Bahamas
![]() |
![]() |
![]() |
![]() |
||
| Atlantis Phase II | Tank set in mortar bed |
Ready to fiberglass joint | Joint spliced | ||
![]() |
![]() |
|||
| Perforated screen over skimmer box |
Completed tank | |||
Home |
About
K&A |
Projects |
Specifications |
Construction Details |
FAQ |
Glossary
Related Links |
Site Index |
Map to
K&A |
Downloads |
Inquiry Forms |
Employment
| Questions? Email
us or call 707-552-3500 |
![]() |
Last updated: 09/21/06 |